Renewal of Secondary Sedimentation Tank 17 and 18
Small Scale Capital Program
Client
Melbourne Water
Location
Eastern Treatment Plant
Sector
Water and Sewer
Type
Construction
Duration
15 Months – July 2018 to October 2019
Key Facts
There are 26 Secondary Sedimentation Tanks (SST) at the Eastern Treatment Plant (ETP) have been in continuous operation since commissioning in 1975.
Secondary Sedimentation tanks are used in the secondary treatment stages of sewerage treatment process.
Background
A condition assessment was carried out by Melbourne Water in which degradation of concrete, sealants, and steel coating was identified. Rehabilitation of the tanks needed to take place in a safe manner with limited disruption to the operations and adjoining facilities. Purpose of the Rehabilitation work was to enhance the asset life.Scope of Service
The scope of work comprised of the following:
- Emptying and cleaning of SST17 and 18
- Undertake appropriate scanning to identify any hidden services
- Condition assessment (visual) of existing concrete and steel structures to verify extent of works to be performed
- Design and fabricate any temporary structures/platforms required for works
- Renewal of existing floor and wall sealing.
- Coating of internal walls of SST with epoxy coating
- Rehabilitation of coating on reinforcement steel
- Rehabilitation of coating on structural steel
- Provide reports on the remediation works.
Safety
Asbestos was identified in the existing sealant material which were removed fully supervised and monitored by a qualified hygienist.